Audit the experiment before fitting the model.
Track specimens, loading sequences, prior damage, repairs, channels, units, processing choices, source documents, and unresolved gaps.
See the NIST data audit ↗Clear Anvil is exploring software for reproducible seismic test data, nonstructural component evidence, and decision-focused test planning.
This is a research direction, not a deployed engineering product or a claim of validated building performance.
Existing tools can simulate structural response, quantify uncertainty, and estimate damage or recovery. A remaining practical problem is keeping physical evidence, model assumptions, and the next research decision connected.
Track specimens, loading sequences, prior damage, repairs, channels, units, processing choices, source documents, and unresolved gaps.
See the NIST data audit ↗Compare commanded and measured table motion, document transformations, preserve versioned outputs, and regenerate tables and figures.
Read the test-data workflow ↗Prototype a test-selection policy around an engineer-approved component or retrofit decision, then compare it with conventional schedules and simpler baselines.
Ceilings, partitions, façades, equipment, and building services can interrupt use after an earthquake even when the main structure remains standing. A focused benchmark can test the data method before anyone makes a building-level recovery claim.
Pin a public dataset version and trace records back to specimens, campaigns, source reports, loading order, damage, and repairs.
With an engineer, specify the component family, two approved alternatives, test cost, evidence threshold, and conditions for “insufficient evidence.”
Evaluate conventional schedules, random or space-filling selection, information gain, and decision-focused selection under the same budget.
Freeze the method before a partner laboratory runs new specimens, then report calibration, wrong-choice rate, test count, and failures.
Clear Anvil can build the information and evaluation layer around a public benchmark or collaborator-supplied research dataset. Engineering objectives and physical-test authority stay with qualified partners.
Bring a component family, research question, or public dataset. We can map the evidence and define what a useful software prototype would have to prove.
Earthquake-resistant architecture involves early coordination among architectural configuration, the structural system, the envelope, interiors, services, access, and the owner's recovery goals. Software can compare explicit alternatives; it cannot replace the responsible design team.
Review site assumptions, plan and section, load-path continuity, façades, interiors, services, and recovery objectives while alternatives are still open.
Read the guide ↗Building use can depend on nonstructural systems, utilities, access, inspections, repairs, staffing, and occupancy-specific requirements.
See NIST's research program ↗The research concerns test evidence and performance questions. It does not predict the date, location, or magnitude of an earthquake.
Read the USGS explanation ↗Any future prototype must be evaluated within a declared domain and under the procedures of the engineering and laboratory teams responsible for the work.
Tell us about the public benchmark, test-data workflow, or component question. We can define a bounded software and evidence project with the right engineering collaborators.
jamil@clearanvil.com